Notice: The called constructor method for WP_Widget in LayerSlider_Widget is deprecated since version 4.3.0! Use
__construct()
instead. in /var/www/vhosts/nsolv-dev.edlfb.net/wp-includes/functions.php on line 3901 Notice: The called constructor method for WP_Widget in Mfn_Flickr_Widget is deprecated since version 4.3.0! Use
__construct()
instead. in /var/www/vhosts/nsolv-dev.edlfb.net/wp-includes/functions.php on line 3901 Notice: The called constructor method for WP_Widget in Mfn_Login_Widget is deprecated since version 4.3.0! Use
__construct()
instead. in /var/www/vhosts/nsolv-dev.edlfb.net/wp-includes/functions.php on line 3901 Notice: The called constructor method for WP_Widget in Mfn_Menu_Widget is deprecated since version 4.3.0! Use
__construct()
instead. in /var/www/vhosts/nsolv-dev.edlfb.net/wp-includes/functions.php on line 3901 Notice: The called constructor method for WP_Widget in Mfn_Recent_Comments_Widget is deprecated since version 4.3.0! Use
__construct()
instead. in /var/www/vhosts/nsolv-dev.edlfb.net/wp-includes/functions.php on line 3901 Notice: The called constructor method for WP_Widget in Mfn_Recent_Posts_Widget is deprecated since version 4.3.0! Use
__construct()
instead. in /var/www/vhosts/nsolv-dev.edlfb.net/wp-includes/functions.php on line 3901 Notice: The called constructor method for WP_Widget in Mfn_Tag_Cloud_Widget is deprecated since version 4.3.0! Use
__construct()
instead. in /var/www/vhosts/nsolv-dev.edlfb.net/wp-includes/functions.php on line 3901 Operations | Nsolv

Operations

Nsolv began field operations with the launch of its pilot plant at Suncor’s Dover lease in January 2014. Here, the company is proving the economic and environmental advantages of its technology. Having met all key performance indicators, we continue to look for a variety of partnerships for developing heavy oil reserves, whether they are prime-shallow, thin, low-pressure or carbonate-type reservoirs.

BEST Pilot Plant

The BEST (Bitumen Extraction Solvent Technology) Pilot Plant demonstrates Nsolv technology at field-scale in advance of full commercialization. Suncor’s Dover lease in the Athabasca region is the host site for the 250-300 barrel-per-day facility, comprising a 300-m horizontal well pair and a surface plant for processing produced hydrocarbons. The pilot plant produced its 40,000th barrel of oil in early 2015, while meeting all of the following key performance indicators:

  •  Extraction Rate: ≥ SAGD extraction rates at 40° - 60°C with zero water usage
  • Oil Quality:
    • Upgrade in-situ bitumen from roughly 8 °API to 13 °API
    • Nickel and vanadium less than 125 ppm
    • Carbon residue at ~5%
  •  GHG Emissions: Reduction of 75-80% relative to SAGD
  • No water consumption/waterless start up   

Key suppliers for the BEST Pilot Plant include: